This year, the High School affiliated to Changzhou Institute of Education and Science will usher in the first transition year in Beijiao High School, more than 300 teachers and students will return to the new campus to start learning and living, and at the same time, the school will recruit 8 new classes of senior high students.
In order to ensure the use of hot water in the dormitory, our company will complete the hot water system for male and female students in the dormitory before the beginning of the semester.
The hot water system is a pressurized hot water system, and the heat source of the system is an air source heat pump + gas boiler.
The main heating part of the system is the hollow air source heat pump, and the gas boiler is the auxiliary heating.
After the system is heated with air energy saving, in case of winter - when the water is overloaded, the gas boiler is used to quickly heat the system water.
The project adopts air source heat pump KFXRS-52II model and gas boiler 380 model.
The system of the pressurized water tank can not worry about the water pressure problem, and meet the stable outlet pressure during the use of public bathrooms and separate showers in dormitories.











