School hot water project needs to solve the following problems:
1, the school dormitory number is large, the water time is concentrated, and the water consumption is large in a short time;
2, students have high requirements for hot water temperature, serious waste, difficult to manage;
3, as far as possible to reduce installation costs, use costs and maintenance costs;
4, taking into account environmental protection, safety and other factors.
Basic parameters required for school hot water project design:
1. How many dormitories are there? How many students live in each dormitory? Is it a unified water supply or separate water supply?
2. Water use: bucket (20-30Kg per person per day)/shower (40-60Kg per person per day)
3. Number of dormitory floors. Hot water pipe to the shower room? The balcony? The hallway?
4, how to manage: timing (time segment) water supply? Quantitative charge water supply (water meter or IC card water meter)
5, equipment installation site (length, width, orientation, and surrounding buildings)