Hotel hot water project needs to solve the problem:
1, hot water supply is the hotel's basic service, must ensure 24 hours uninterrupted supply;
2, to ensure reasonable water temperature and stable water pressure;
3, the passenger flow is not very uniform, easy to appear peak water consumption, but must ensure the comfort of guests;
4, as far as possible to reduce installation costs, use costs and maintenance costs;
5, taking into account environmental protection, safety and other factors.
The basic parameters required for the design of hotel hot water project:
1. How many houses are there? What is each one used for?
2, the number of rooms: the daily water consumption of rooms is designed to be 120-150Kg.
3, restaurants, kitchens and other places where hot water is needed.
4, the number of floors, downstairs pipeline insulation? Determine water pipe heat loss?
5, equipment installation site (length, width, orientation, and surrounding buildings)