The Army hot water project needs to solve the following problems:
1, the number of military dormitories is large, the water time is concentrated, and the water consumption is large in a short time. .
2, the need for 24-hour supply, but hot water is everyone's welfare, to try to meet everyone has hot water.
3, as far as possible to reduce installation costs, use costs and maintenance costs.
4, taking into account environmental protection, safety and other factors.
The basic parameters required for the design of the army hot water project:
1. How many dormitories are there? How many people live in each dormitory? Is it a unified water supply or separate water supply?
2. Water use: bucket (20-30Kg per person per day)/shower (40-60Kg per person per day)
3. Number of dormitory floors. Hot water pipe to the shower room? The balcony? The hallway?
4, how to manage: timing (time segment) water supply? Ration water supply (water meter or IC card water meter)
5, equipment installation site (length, width, orientation, and surrounding buildings)